Project Owner: | Long Point Development, Inc. |
Job Scope: | $3.2 million |
Description: | Provide and install 22,000 linear feet of pipe in rigorous soil conditions with 30 fire hydrants and 32 water services comprising numerous water company connections. |
Project Owner: | Army Corps of Engineers |
Job Scope: | $2.5 million |
Description: | Enlarge Prado Dam to control flooding and raise the height of the dam. Install a SARI pipeline Reach IV, abandon a 60 inch SARI line, install dual HDPE 48 inch lines and install 48 inch PVC lined RCP. |
Project Owner: | Heraeus Metals Processing, Inc. |
Job Scope: | $4.6 million |
Description: | Perform civil, mechanical, structural engineering and installation of fire protection / sprinkler systems for new waste water treatment plant in Santa Fe Springs, California. |
Project Owner: | Carmel Area Wastewater District |
Job Scope: | $2.0 million |
Description: | Modified and upgraded three existing equalization basins through blower upgrades, course and fine air bubble duffers, piping, pumps, mixers and anoxic baffle wall installations. This facility will have a 2.2 million gallons per day microfiltration/reverse osmosis capacity and provide potable water to the Pebble Beach Community Services District. |
Project Owner: | City of Yucaipa |
Job Scope: | $1.8 million |
Description: | Total rated capacity of the solar generation is 218 kW, there are 1183 each, 235 WDC solar panels. |