we believe in pc - planning and communication. we simulate what could be to find the right answer for what will be. Saving you money, time and frustration.





Terranea Spa and Resorts

Project Owner:

Long Point Development, Inc.

Job Scope:

$3.2 million

Description:

Provide and install 22,000 linear feet of pipe in rigorous soil conditions with 30 fire hydrants and 32 water services comprising numerous water company connections.



Prado Dam

Project Owner:

Army Corps of Engineers

Job Scope:

$2.5 million

Description:

Enlarge Prado Dam to control flooding and raise the height of the dam. Install a SARI pipeline Reach IV, abandon a 60 inch SARI line, install dual HDPE 48 inch lines and install 48 inch PVC lined RCP.



Heraeus Waste Water Treatment Plant

Project Owner:

Heraeus Metals Processing, Inc.

Job Scope:

$4.6 million

Description:

Perform civil, mechanical, structural engineering and installation of fire protection / sprinkler systems for new waste water treatment plant in Santa Fe Springs, California.



Carmel Area Wastewater District

Project Owner:

Carmel Area Wastewater District

Job Scope:

$2.0 million

Description:

Modified and upgraded three existing equalization basins through blower upgrades, course and fine air bubble duffers, piping, pumps, mixers and anoxic baffle wall installations. This facility will have a 2.2 million gallons per day microfiltration/reverse osmosis capacity and provide potable water to the Pebble Beach Community Services District.



Yucaipa Solar Panel Carport

Project Owner:

City of Yucaipa

Job Scope:

$1.8 million

Description:

Total rated capacity of the solar generation is 218 kW, there are 1183 each, 235 WDC solar panels.